OFFSHORE TECHNOLOGY CONFERENCE

Extreme High Pressure and/or High Temperature

Loading

Extreme High Pressure and/or High Temperature

Tuesday, 2 May
602
Technical / Poster Session
Chairperson(s)
Darren Bane , Baker Hughes
Elena Melchert , Energia Consulting LLC
  • 0930-0948 32305
    Best Practices For Handling Completion Tubulars To Ensure Design Life Well Integrity In Hpht Wells
    J.R. Angelle, N. Alleman, Expro Group Ltd.
  • 0950-1008 32407
    Geopressured Geothermal: Correlations To Offshore High Pressure High Temperature Geothermal Opportunities
    J.F. Batir, E. Gentry, H. Soroush, PETROLERN
  • 1010-1028 32237
    Junction Plate For High Pressure High Temperature System
    S. Prakash, P. Semwal, J. Strain, Oceaneering International Inc
  • 1030-1048 32595
    Acoustic Set Liner Hanger For Hpht Applications
    M. Krueger, Baker Hughes
  • 1050-1108 32234
    Tubular Handling And Cementing, Preparation For 8th Generation Rigs And 20k Wells
    L. Smith, C. Jordan, Expro
  • 1110-1128 32277
    Running In Hot: Floating In Casing In High Temperature Wells
    B. Cheeseman, J.P. Powell, S. Yang, NCS Multistage
  • 1130-1148 32274
    Filtration Properties Of Biodegradable Fiber-containing Drilling Fluids For Offshore Shallow Weak Formations
    K. Takahashi, S. Naganawa, E.K. Bjarkason, Akita University; R. Mukai, Kaneka Corporation
  • Alternate 32641
    The Drilling Efficiency Value Proposition : Reducing The Carbon Footprint By Doing Simple Operations Faster And Smarter.
    R. Bacon, Sekal As
  • Alternate 32653
    A Porothermoelastic Model Considering The Transient Temperature Boundary For Borehole Stability Drilling Through The Porous Rocks In Deepwater Hpht Formation
    J. Gao, Southwest Petroleum University
  • Alternate 32467
    Determination Of Critical Production Rate Of High Pressure High Temperature Gas Well Based On Maximum Allowable Annular Pressure
    B. Zhang, CNPC