OFFSHORE TECHNOLOGY CONFERENCE

HPHT Challenges and Technology Advancements

Loading

HPHT Challenges and Technology Advancements

Wednesday, 3 May
602
Technical / Poster Session
This Session will cover Challenges, Technology Advancement, and Qualification of High Pressure/High Temperature (HPHT) Equipment. Participants will learn about various aspects of Design, Verification & Validation of Subsea Systems (Wellheads, Trees, BOPs, Risers, etc.). Specialized topics include Metal Sealing Technology, Fatigue Performance, Assessment Methodologies for HPHT Applications, and Base Load Renewable Energy Systems. Presenters come from a good cross-section of the energy sector including OEMs, Operators, and Regulators. A broad audience will benefit from these presentations, including engineers, managers, executives from OEMs, contractors, operators, regulators and third parties.
Chairperson(s)
Jim Kaculi, Vice President - Engineering and Research and Development , Dril-Quip, Inc.
Greg Kusinski, Team Lead Regulatory Affairs , Chevron Corporation
Sponsoring Societies:
  • American Society of Mechanical Engineers (ASME)
  • 0930-0948 32608
    A Subsea Wellhead Interface Rated to Handle Extreme Drilling Requirements in the Gulf of Mexico
    A. Rodela, P. Potter, G. Bornia, B. Zhu, S. Peters, Baker Hughes
  • 0950-1008 32420
    A Subsea Wellhead Solution Ready To Meet Challenging and Critical Endurance and Performance Needs
    S. Amini, P. Potter, D. Attaway, G. Bornia, B. Zhu, Baker Hughes
  • 1010-1028 32329
    API 17TR8 - HPHT Design Guideline for Subsea Equipment - A Focus on Fatigue
    H.B. Skeels, TechnipFMC; F.E. Shanks, R.M. Hoshman, Department of Interior - BSEE
  • 1030-1048 32453
    Changing the Game - Enhanced OTEC System Design
    R. Robinson, G. Engelmann, Excipio Energy, Inc
  • 1050-1108 32657
    Comparison of Wellhead Fatigue Methods Using Acoustic and Standalone Monitoring Data for HPHT Developments
    B. Mercan, M. Campbell, 2H Offshore Inc.; W. Lu, T.W. Chase, Chevron U.S.A. Inc.
  • 1110-1128 32632
    Subsea Wellhead Fatigue Tracking Tool for HPHT Developments
    W. Lu, X. Guan, T.W. Chase, W. Penaloza, Chevron U.S.A. Inc.; B. Mercan, 2H Offshore Inc.
  • 1130-1148 32203
    Managing the High Temperature Risk in a Horizontal HPHT Deepwater Well
    Y. Liu, S. Griffith, F. Ain, Shell; J.E. Palacio, K&M Technology Group; A. Tchagop, D.C. Lasher, B.D. Champion, SLB