OFFSHORE TECHNOLOGY CONFERENCE

Overcoming the Challenges of Integrity Management and Life Extension at Complex Offshore Assets

Loading

Overcoming the Challenges of Integrity Management and Life Extension at Complex Offshore Assets

Wednesday, 3 May
604
Technical / Poster Session
Chairperson(s)
Carlos Henriques , Petrobras
Anna Paula Duarte , Schlumberger
  • 1400-1418 32599
    Integrity Management: A Basic Pilar Of Petrobras Efficiency Improvement Program For Offshore Production Units
    M.E. Ramis, Petrobras -Petroleo Brasileiro; A.M. Langoni, F. Pozzobon, F.M. dos Santos, F.C. do Rego, Petrobras
  • 1420-1438 32362
    Proactive Intervention: A Holistic Examination Of Safeguarding Well Integrity, And Optimizing Future Production, To Collaboratively Maximize A Field’s Potential Safeguarding Well Integrity, And Optimizing Future Production, To Collaboratively Maximize A Field’S Potential
    M.E. Billingham, Schlumberger; L. Pacheco, M. Moreira, Petrobras; J. Cornelio, K. Singh, Schlumberger
  • 1440-1458 32198
    Offshore Integrity Management And Life Extension - A Vision Of The Application Of Subsea Robotics In Assuring Asset Integrity
    A. GOWER, TotalEnergies
  • 1500-1518 32464
    Optimizing The Inspection Plans Of Subsea Equipment Using Risk Analysis Methodologies And Simulations
    L.O. Barros, R. Orlowski, Petrobras
  • 1520-1538 32540
    FPSO Life Extension By Optimizing Cargo Load Management
    M.F. Mendes, L. Carneiro, M. Bueno, Shell Brasil
  • 1540-1558 32637
    Improving Fpso Integrity By The Development And Certification Of Composite Materials Into New Applications And Locations On Topside And Hull.
    D.F. Filho, MODEC Servicos De Petroleo Do Brasil Ltda; G.G. SOUZA, NOV; S. Eves, NOV Inc.; C. Jarreta Neto, PETROBRAS
  • 1600-1618 32377
    Human Resource Program For Integrity Management & Life Assessment: Subsea Cases Application
    C.A. Costa, M.F. Costa, G. Drumond, Universidade Federal do Rio de Janeiro
  • Alternate 32181
    Mooring Line Failure Detection Using Artificial Neural Networks: An Application To Field Data Including Artificial Failure Cases
    D. Sidarta, Technip Energies; E. Auburtin, A. Ledoux, TotalEnergies; H. Lim, A. Leridon, N. Tcherniguin, Technip Energies
  • Alternate 32502
    Qualitative Approaches For Calculating Initial Repair And Failure Likelihood Estimates Used In The Development Of Hull Structure Risk-based Inspections
    R. Spong, R. Roberts, D. Byatt, Spire Engineering; Z. Li, D. Xia, D. Petruska, BP; H. Li, Former BP